One

Overview

Theory: Escalation of commitment
Primary field: Negotiation & Conflict Resolution
Core question: Why do decision makers put more resources into a course of action after the evidence says it is failing?
By: Saif Alghamdi

Escalation of commitment names a behavioural regularity: after a setback, decision makers frequently allocate more to the same failing course of action than they would have allocated to it as a fresh proposal. The regularity is well established in the laboratory. The explanation is not settled, and the contest between the candidate explanations is where the research value of the topic sits.

The normative point that a cost already incurred and unrecoverable should not enter a forward-looking decision is a result in cost analysis, and it is argued on the production and cost theory page in managerial economics. It is assumed here. This page takes up the behavioural question the normative result cannot answer: given that people know the rule, why does the pattern persist, and under what conditions does it get worse?

The topic belongs in a section on conflict because escalation is usually social. Commitments are made in public, defended against rivals, and abandoned in front of the people who approved them. A large part of what keeps a failing project alive is a dispute about who was right, running alongside the dispute about what to do next.

الأول

نظرة عامة

النظرية: تصعيد الالتزام
الحقل الأساسي: المفاوضات وحل النزاعات
السؤال الجوهري: لماذا يضخّ متّخذو القرار موارد أكثر في مسلكٍ بعد أن يقول الدليل إنه فاشل؟
إعداد: سيف الغامدي

يسمّي تصعيدُ الالتزام انتظامًا سلوكيًّا: فبعد النكسة كثيرًا ما يخصّص متّخذو القرار للمسلك الفاشل نفسه أكثر ممّا كانوا سيخصّصون له لو عُرض عليهم مقترحًا جديدًا. والانتظامُ مقرَّرٌ جيدًا في المختبر. أما التفسير فغير محسوم، وفي التنازع بين التفسيرات المرشَّحة تكمن قيمةُ الموضوع البحثية.

وأما المقولة المعيارية بأن الكلفة المنفقة غير القابلة للاسترداد لا ينبغي أن تدخل في قرارٍ ناظرٍ إلى الأمام فنتيجةٌ في تحليل التكاليف، وهي محاجَجٌ فيها في صفحة نظرية الإنتاج والتكاليف في الاقتصاد الإداري، وتُفترَض هنا. وتتناول هذه الصفحة السؤال السلوكي الذي لا تجيب عنه النتيجةُ المعيارية: مع أن الناس يعرفون القاعدة، فلماذا يستمرّ النمط، وفي أيّ الشروط يشتدّ؟

وموضعُ الموضوع في قسمٍ عن النزاع لأن التصعيد اجتماعيٌّ في الغالب. فالالتزاماتُ تُقطَع علنًا، ويُدافَع عنها في وجه المنافسين، وتُترَك أمام الذين أقرّوها. وجانبٌ كبير ممّا يُبقي مشروعًا فاشلًا حيًّا نزاعٌ في مَن كان على صواب، يجري إلى جانب النزاع في ما العمل.

Two

Where It Came From

Staw, 1976. The founding experiment. Participants allocated research and development funds to one of two divisions of a hypothetical firm, then received feedback on how the chosen division had performed, then allocated a second round. The design crossed personal responsibility for the first decision × the valence of the feedback. The largest second allocations came from participants who had made the first decision themselves and had then been told it went badly. Neither factor alone produced the effect, and that interaction is what made the finding a theory rather than an anecdote.

Staw, 1981, and the self-justification account. The original explanation is retrospective rationality. Having chosen, the decision maker is motivated to demonstrate that the choice was correct, to themselves and to observers, and further investment is a way of asserting that the earlier judgement will yet be vindicated. The account predicts the responsibility effect directly, since only the original chooser has a decision to defend.

Arkes and Blumer, 1985. The sunk cost effect shown across many small studies, including situations with no personal responsibility for the prior expenditure. This is the first serious problem for a purely self-justificatory account, and the authors add a norm against appearing wasteful as a partial explanation.

Whyte, 1986. The framing rival. Prospect theory says a prior loss puts the decision maker in the domain of losses, where the value function is convex and risk seeking follows. Continuing a failing project is then the risky option preferred over a certain loss, and no motive to justify anything is required. The account predicts escalation by decision makers who inherited the situation, which self-justification does not.

Brockner, 1992. The review that organizes the determinants rather than choosing a winner, and argues that escalation is multiply determined: project characteristics, psychological processes, social pressures and organizational features each contribute, and studies that test one in isolation will find modest effects.

Sleesman, Conlon, McNamara and Miles, 2012. The meta-analysis. It confirms that several determinants hold across studies, sunk cost, proximity to project completion, personal responsibility and public accountability among them, while showing that individual effect sizes are smaller than the vividness of the founding experiment suggests, and that moderators matter more than the main effect.

الثاني

الأصل والنشأة

ستو، ١٩٧٦. التجربة المؤسِّسة. خصّص المشاركون أموالَ بحثٍ وتطوير لإحدى شعبتين في منشأةٍ افتراضية، ثم تلقّوا تغذيةً راجعة عن أداء الشعبة المختارة، ثم خصّصوا جولةً ثانية. وقاطع التصميمُ بين المسؤولية الشخصية عن القرار الأول × اتجاه التغذية الراجعة. وجاء أكبرُ تخصيصٍ ثانٍ ممّن اتّخذوا القرار الأول بأنفسهم ثم أُخبروا أنه ساء. ولم ينتج أيُّ العاملين الأثرَ وحده، وذلك التفاعل هو ما جعل النتيجة نظريةً لا نادرة.

ستو، ١٩٨١، وتفسيرُ تبرير الذات. التفسير الأصلي هو العقلانية الرجعية. فمتى اختار المرء صار مدفوعًا إلى إثبات صواب اختياره، لنفسه وللناظرين، ويكون الإنفاق الإضافي سبيلًا إلى تأكيد أن الحكم الأول سيصدق بعدُ. ويتنبّأ هذا التفسير بأثر المسؤولية مباشرةً، إذ لا يملك قرارًا يدافع عنه إلا المختارُ الأصلي.

آركس وبلومر، ١٩٨٥. أثرُ الكلفة الغارقة مبيَّنًا في دراساتٍ صغيرة كثيرة، منها مواقفُ لا مسؤولية شخصية فيها عن الإنفاق السابق. وهذه أول مشكلةٍ جدّية لتفسيرٍ تبريريّ محض، ويضيف المؤلّفان عُرفًا يمنع الظهور بمظهر المبذّر تفسيرًا جزئيًّا.

وايت، ١٩٨٦. منافسُ التأطير. تقول نظريةُ التوقّع إن خسارةً سابقة تضع متّخذ القرار في مجال الخسائر، حيث دالّةُ القيمة محدَّبة ويتبعها السعي إلى المخاطرة. فمواصلةُ مشروعٍ فاشل هي حينئذٍ الخيار المخاطر المفضَّل على خسارةٍ مؤكّدة، ولا يلزم دافعٌ إلى تبرير شيء. ويتنبّأ هذا التفسير بتصعيدٍ من متّخذي قرارٍ ورثوا الموقف، وهو ما لا يتنبّأ به تبريرُ الذات.

بروكنر، ١٩٩٢. المراجعةُ التي تنظّم المحدِّدات ولا تختار غالبًا، وترى أن التصعيد متعدّد التحديد: فخصائصُ المشروع، والعملياتُ النفسية، والضغوطُ الاجتماعية، والملامحُ التنظيمية، كلٌّ منها يسهم، والدراساتُ التي تختبر واحدًا منعزلًا ستجد آثارًا متواضعة.

سليسمان وكونلون وماكنمارا ومايلز، ٢٠١٢. التحليلُ التجميعي. يؤكّد ثبات عدّة محدِّداتٍ عبر الدراسات، منها الكلفةُ الغارقة، وقربُ إنجاز المشروع، والمسؤوليةُ الشخصية، والمساءلةُ العلنية، ويبيّن في الوقت نفسه أن أحجام الآثار المفردة أصغرُ ممّا توحي به حيويةُ التجربة المؤسِّسة، وأن المعدِّلات أهمُّ من الأثر الرئيس.

Three

How It Works

Two rival mechanisms, one observable pattern. Self-justification says escalation is motivated: the decision maker defends a prior judgement. Framing says escalation is perceptual: a prior loss shifts the reference point, the continuation option becomes a gamble against a certain loss, and risk seeking follows. Both predict more money into a failing project. They separate on one variable, which is who is deciding.

CaseSelf-justification predictsFraming predicts
Original decision maker, negative feedbackStrong escalationEscalation
Successor who inherited the projectLittle or noneEscalation, since the loss is still framed as the account's
Decision made privately, no audienceWeaker escalationUnchanged
Decision made publicly before criticsStronger escalationUnchanged
Prior cost incurred by someone elseNoneEscalation if the loss is attributed to the current account

The successor case is the discriminating test and the evidence is mixed. Replacing the decision maker reduces escalation, which supports self-justification, but it does not eliminate it, which supports a residual framing or waste-avoidance effect. The honest summary is that both mechanisms operate, that their relative weight depends on how public the original commitment was, and that a study designed around only one of them will attribute to it variance the other produced.

Determinants worth separating. Project determinants include the size of the sunk cost, how close the project is to completion, and whether the setback is read as temporary. Psychological determinants include self-justification, framing, and the illusion of control. Social determinants include public commitment, accountability to an audience, rivalry with a critic, and the reputational cost of reversal. Organizational determinants include political support, the absence of a stopping rule, budget structures that make continuation the default, and the fact that in most organizations no one is rewarded for cancelling a project.

Persisting is not escalating. Escalation is defined by the gap between what the decision maker allocated and what a forward-looking analysis would have justified at that moment, on the information then available. A project that continues and later fails may have been the right call at the decision point. A project that continues and succeeds may still have been escalation. Field studies that identify escalation by the outcome are using hindsight to define the variable, and much of the applied literature does exactly this.

De-escalation. The remedies follow the determinants rather than the psychology. Separate the person who evaluates from the person who committed. Set stopping criteria before the first allocation, in the same document that authorizes it, so abandoning is executing a plan rather than admitting an error. Stage the funding so that continuation requires a fresh positive decision rather than the absence of a negative one. Make the reference point the current position rather than the original budget, since a review that reports overspend against the original plan reinstates the loss frame that caused the problem. And separate evaluation of the project from evaluation of the sponsor, because as long as the two are joined the sponsor's defence of themselves is indistinguishable from advocacy for the project.

الثالث

الآلية والفرضيات

آليتان متنافستان ونمطٌ ملحوظ واحد. يقول تبريرُ الذات إن التصعيد مدفوع: فمتّخذ القرار يدافع عن حكمٍ سابق. ويقول التأطير إنه إدراكي: فخسارةٌ سابقة تزحزح نقطة الإسناد، فيصير خيارُ المواصلة مقامرةً في وجه خسارةٍ مؤكّدة، ويتبع ذلك السعيُ إلى المخاطرة. وكلاهما يتنبّأ بمزيد مالٍ في مشروعٍ فاشل. ويفترقان في متغيّرٍ واحد هو مَن الذي يقرّر.

الحالةتنبّؤ تبرير الذاتتنبّؤ التأطير
متّخذ القرار الأصلي مع تغذيةٍ سلبيةتصعيدٌ قويتصعيد
خلَفٌ ورث المشروعقليلٌ أو معدومتصعيد، لأن الخسارة ما تزال مؤطَّرةً على الحساب نفسه
قرارٌ اتُّخذ سرًّا بلا جمهورتصعيدٌ أضعفلا يتغيّر
قرارٌ اتُّخذ علنًا أمام منتقدينتصعيدٌ أقوىلا يتغيّر
كلفةٌ سابقة أنفقها غيرُهلا تصعيدتصعيدٌ إن نُسبت الخسارة إلى الحساب الحالي

وحالةُ الخلَف هي الاختبار الفارق والدليلُ فيها مختلط. فاستبدالُ متّخذ القرار يقلّل التصعيد، وهذا يسند تبرير الذات، لكنه لا يلغيه، وهذا يسند أثرًا متبقّيًا للتأطير أو لتجنّب التبذير. والخلاصةُ الأمينة أن الآليتين تعملان، وأن وزنهما النسبي يتوقّف على قدر علانية الالتزام الأصلي، وأن دراسةً مصمَّمة حول واحدةٍ منهما ستنسب إليها تباينًا أنتجته الأخرى.

محدِّداتٌ يجدر الفصل بينها. فمحدِّداتُ المشروع تشمل حجم الكلفة الغارقة، وقربَ المشروع من الإنجاز، وهل تُقرَأ النكسة عارضة. والمحدِّداتُ النفسية تشمل تبرير الذات، والتأطير، ووهمَ السيطرة. والمحدِّداتُ الاجتماعية تشمل الالتزام العلني، والمساءلةَ أمام جمهور، والمنافسةَ مع ناقد، والكلفةَ السمعية للتراجع. والمحدِّداتُ التنظيمية تشمل السند السياسي، وغيابَ قاعدة توقّف، وهياكلَ ميزانيةٍ تجعل المواصلة هي الأصل، وأنه لا يُكافأ أحدٌ في أكثر المنظمات على إلغاء مشروع.

والمثابرةُ ليست تصعيدًا. فالتصعيد معرَّفٌ بالفجوة بين ما خصّصه متّخذ القرار وما كان تحليلٌ ناظرٌ إلى الأمام يبرّره في تلك اللحظة، بالمعلومة المتاحة حينها. فمشروعٌ يستمرّ ثم يفشل قد يكون القرارُ فيه صائبًا عند نقطة القرار. ومشروعٌ يستمرّ وينجح قد يكون تصعيدًا مع ذلك. والدراساتُ الميدانية التي تعيّن التصعيد بالنتيجة تستعمل حكمةَ ما بعد الحدث لتعريف المتغيّر، وكثيرٌ من الأدبيات التطبيقية يفعل هذا بعينه.

وقف التصعيد. العلاجاتُ تتبع المحدِّدات لا علمَ النفس. فافصل مَن يقوّم عمّن التزم. وضَع معايير التوقّف قبل التخصيص الأول، في الوثيقة التي تأذن به نفسها، فيصير التركُ تنفيذًا لخطّة لا إقرارًا بخطأ. ورتّب التمويل على مراحل بحيث تقتضي المواصلةُ قرارًا إيجابيًّا جديدًا لا مجرّد انتفاء قرارٍ سلبي. واجعل نقطة الإسناد الوضعَ الراهن لا الميزانية الأصلية، فمراجعةٌ تُبلغ عن تجاوزٍ على الخطّة الأصلية تعيد نصب إطار الخسارة الذي سبّب المشكلة. وافصل تقويم المشروع عن تقويم راعيه، فما دام الأمران مقترنين لا يتميّز دفاعُ الراعي عن نفسه من مناصرته للمشروع.

Four

Using It in Research

The laboratory design is the one with clean identification. Assign responsibility for an initial decision, assign the feedback, and measure the second allocation. The factorial structure is what separates the two mechanisms, and no field design reproduces it, because in the field nobody randomizes who made the first decision.

Field designs need a decision maker change that is exogenous. A rotation policy, a retirement, a reorganization or a mandated tenure limit changes who owns a project for reasons unrelated to how the project is going. Comparing continuation decisions on comparable projects before and after such a change is the strongest available field test of the responsibility effect, and it is rare.

What has to be measured, and it is the hard part. The counterfactual. To claim escalation, a study must establish what a reasonable forward-looking decision would have been at the decision point, using information available then. Sources that make this feasible include stage-gate documentation, internal forecast revisions, independent technical reviews, and lender or consultant assessments filed at the time. Without one of these the study can document persistence and nothing more.

Escalation is a comparison, not an observation. The dependent variable is the difference between the allocation made and the allocation a de novo analysis would support on the same information. Studies that treat any additional funding of a troubled project as escalation will find escalation everywhere, including in the many cases where continuing was correct, and their effect sizes are not comparable with the experimental literature.

Angles where the setting is distinctive.

  • Giga-projects where cancellation is politically as well as economically costly. When a programme is publicly identified with a national commitment, the social determinants of escalation, public commitment and reputational cost of reversal, are at their maximum while the economic determinants are unchanged. The theory predicts unusually high escalation, and the setting is one of the few places where the social channel can be observed at a scale where it dominates.
  • The state as owner, regulator and customer at once. Where the same actor authorized the project, regulates it and buys its output, the independent review that de-escalation requires has no independent party to come from. Mapping which review functions are genuinely separated, and whether separation predicts termination, is a governance question with a behavioural theory behind it.
  • Joint ventures with a mandated local partner. Exit from a venture that regulation required is harder than exit from one freely chosen, so continuation may be a constraint rather than a bias. Distinguishing the two is exactly the counterfactual problem above, and the setting makes the constraint documentable.
  • Public sector reorganizations. Administrative restructurings are commitments with diffuse benefits, long horizons and highly visible sponsors, and they are rarely terminated. They are an under-used field site for escalation precisely because the outcome measure is soft, which forces a study to build the counterfactual carefully.
  • Procurement with fixed award rules. Where terms and change-order procedures are set by regulation, the cost of continuing a bad contract and the cost of retendering are both partly determined by rule rather than by choice. That variation across contract types is a source of exogenous change in the cost of de-escalating.
الرابع

التوظيف البحثي

التصميم المخبري هو صاحبُ التحديد النظيف. عيّن المسؤولية عن قرارٍ أول، وعيّن التغذية الراجعة، وقِس التخصيص الثاني. فالبِنيةُ العاملية هي ما يفصل الآليتين، ولا يستنسخها تصميمٌ ميداني، لأن أحدًا في الميدان لا يوزّع عشوائيًّا مَن اتّخذ القرار الأول.

والتصاميم الميدانية تحتاج تغيّرًا خارجيًّا في متّخذ القرار. فسياسةُ تدوير، أو تقاعد، أو إعادةُ تنظيم، أو حدٌّ إلزامي لمدّة التولّي، كلٌّ منها يغيّر مالكَ المشروع لأسبابٍ لا صلة لها بحال المشروع. ومقارنةُ قرارات المواصلة في مشاريع متماثلة قبل ذلك التغيّر وبعده أقوى اختبارٍ ميداني متاح لأثر المسؤولية، وهو نادر.

وما يجب قياسه، وهو الجزء الصعب. النقيضُ الافتراضي. فلادّعاء التصعيد يجب أن تقرّر الدراسة ما كان القرار المعقول الناظر إلى الأمام عند نقطة القرار، بالمعلومة المتاحة حينها. ومن المصادر التي تجعل هذا ممكنًا وثائقُ البوّابات المرحلية، ومراجعاتُ التنبّؤ الداخلية، والمراجعاتُ الفنّية المستقلّة، وتقويماتُ المموّلين أو الاستشاريين المودَعة في حينها. وبلا واحدٍ منها لا توثّق الدراسةُ إلا المثابرة ولا شيء غيرها.

التصعيد مقارنةٌ لا ملاحظة. فالمتغيّر التابع هو الفرق بين التخصيص الواقع والتخصيص الذي يسنده تحليلٌ من جديد على المعلومة نفسها. والدراساتُ التي تعامل كلَّ تمويلٍ إضافي لمشروعٍ متعثّر تصعيدًا ستجد التصعيد في كل مكان، ومنه الحالاتُ الكثيرة التي كانت المواصلةُ فيها صائبة، وأحجامُ آثارها لا تقارَن بالأدبيات التجريبية.

زوايا يتميّز فيها السياق.

  • المشاريع العملاقة حيث يكون الإلغاء مكلفًا سياسيًّا كما هو مكلف اقتصاديًّا. فحين يُعرَف برنامجٌ علنًا بالتزامٍ وطني تبلغ المحدِّداتُ الاجتماعية للتصعيد، من التزامٍ علني وكلفةٍ سمعية للتراجع، أقصاها، والمحدِّداتُ الاقتصادية على حالها. وتتنبّأ النظرية بتصعيدٍ عالٍ غير معتاد، والسياقُ من المواضع القليلة التي تُرصد فيها القناة الاجتماعية على حجمٍ تغلب فيه.
  • الدولة مالكًا ومنظِّمًا وعميلًا في آن. فحيث يأذن الفاعلُ نفسُه بالمشروع وينظّمه ويشتري مخرجاته، لا تجد المراجعةُ المستقلّة التي يقتضيها وقفُ التصعيد طرفًا مستقلًّا تأتي منه. ورسمُ خريطةٍ لأيّ وظائف المراجعة مفصولٌ فصلًا حقيقيًّا، وهل يتنبّأ الفصلُ بالإنهاء، سؤالُ حوكمةٍ خلفه نظريةٌ سلوكية.
  • المشاريع المشتركة بشريكٍ محلّي إلزامي. فالخروجُ من مشروعٍ اقتضته الأنظمة أصعبُ من الخروج من مشروعٍ اختير حرًّا، فقد تكون المواصلةُ قيدًا لا انحيازًا. والتمييزُ بينهما هو مشكلةُ النقيض الافتراضي المذكورة آنفًا بعينها، والسياقُ يجعل القيد قابلًا للتوثيق.
  • إعادة التنظيم في القطاع العام. فعملياتُ إعادة الهيكلة الإدارية التزاماتٌ منافعُها منتشرة وآفاقُها طويلة ورعاتُها ظاهرون، وقلّما تُنهى. وهي موقعٌ ميداني قليل الاستعمال للتصعيد لأن مقياس النتيجة فيها رخو تحديدًا، وذلك يُلزم الدراسة ببناء النقيض الافتراضي بعناية.
  • المشتريات بقواعد ترسيةٍ ثابتة. فحيث تضع الأنظمةُ الشروطَ وإجراءاتِ أوامر التغيير، تتحدّد كلفةُ مواصلة عقدٍ سيّئ وكلفةُ إعادة الطرح جزئيًّا بالقاعدة لا بالاختيار. وذلك التباين بين أنواع العقود مصدرٌ لتغيّرٍ خارجي في كلفة وقف التصعيد.
Five

Limits and Critique

The laboratory paradigm may not capture what a real manager knows. The classic task gives participants a thin scenario, a single feedback signal and no way to investigate. A manager facing a troubled project has private information about causes, a view on whether the setback is temporary, relationships with the people delivering it, and options for changing the plan rather than only continuing or stopping. Behaviour that looks like escalation under an impoverished information set may be reasonable updating under a rich one, and the experimental design cannot distinguish these because it removed the information deliberately.

Field effect sizes are contested. The meta-analytic picture supports several determinants but with modest magnitudes, and field estimates vary widely with how escalation was operationalized. Where the counterfactual is not constructed, reported escalation rates measure the base rate of persistence in troubled projects, which is high for many reasons.

Completion bias and other rational accounts produce the same pattern. Continuing because the project is nearly finished can be correct, since the remaining cost to completion may be small relative to the remaining benefit. Continuing to preserve an option, to maintain a reputation with capital providers, to avoid a contractual penalty, or to learn something that only continuation reveals, are all forward-looking reasons that generate the observed behaviour. A study that does not price these is attributing to bias what may be ordinary optimization under constraints the researcher cannot see.

The two main explanations are hard to separate outside the laboratory. Public commitment and loss framing co-occur in almost every real case. The successor design helps, but successors also inherit budgets, sunk costs and audiences, so even there the mechanisms are only partly disentangled. Papers that declare one mechanism the winner on field data are usually overclaiming.

The construct is defined relative to a normative benchmark that is itself estimated. Whoever builds the counterfactual makes assumptions about discount rates, completion probabilities and residual value, and the estimated escalation is sensitive to those assumptions. Sensitivity analysis over the benchmark is not optional; it is the main robustness check the design requires.

Treat escalation as a comparison against a reconstructed forward-looking decision, not as any increase in funding after bad news, and build that comparison from documents written before the outcome was known. Use responsibility changes that happened for unrelated reasons as the field analogue of the original manipulation. Report the rational explanations, completion proximity, option value and contractual penalties, and show what remains after they are accounted for. The practical lever is structural rather than psychological: stopping criteria written into the authorization, staged funding that requires a fresh yes, and review by someone who did not make the original commitment.
  • Staw, Knee-Deep in the Big Muddy: A Study of Escalating Commitment to a Chosen Course of Action, Organizational Behavior and Human Performance, 1976.
  • Arkes and Blumer, The Psychology of Sunk Cost, Organizational Behavior and Human Decision Processes, 1985.
  • Whyte, Escalating Commitment to a Course of Action: A Reinterpretation, Academy of Management Review, 1986.
  • Brockner, The Escalation of Commitment to a Failing Course of Action: Toward Theoretical Progress, Academy of Management Review, 1992.
  • Sleesman, Conlon, McNamara and Miles, Cleaning Up the Big Muddy: A Meta-Analytic Review of the Determinants of Escalation of Commitment, Academy of Management Journal, 2012.
الخامس

الحدود والنقد

قد لا يلتقط النموذج المخبري ما يعرفه مديرٌ حقيقي. فالمهمّةُ الكلاسيكية تعطي المشاركين سيناريو نحيلًا، وإشارةً راجعة واحدة، ولا سبيل إلى التحرّي. والمديرُ أمام مشروعٍ متعثّر يملك معلومةً خاصّة عن الأسباب، ورأيًا في كون النكسة عارضة، وعلاقاتٍ مع منفّذيه، وخياراتٍ لتغيير الخطّة لا لمجرّد المواصلة أو التوقّف. وسلوكٌ يبدو تصعيدًا في مجموعةِ معلوماتٍ فقيرة قد يكون تحديثًا معقولًا في مجموعةٍ غنية، ولا يستطيع التصميمُ التجريبي التمييز لأنه نزع المعلومة عمدًا.

وأحجام الأثر الميدانية متنازَعٌ فيها. فالصورةُ التجميعية تسند عدّة محدِّدات لكن بمقاديرَ متواضعة، وتتباين التقديراتُ الميدانية تباينًا واسعًا بحسب كيفية تشغيل التصعيد. وحيث لا يُبنى النقيض الافتراضي تقيس معدّلاتُ التصعيد المبلَّغ عنها المعدّلَ الأساس للمثابرة في المشاريع المتعثّرة، وهو مرتفعٌ لأسبابٍ كثيرة.

وانحيازُ الإتمام وتفسيراتٌ عقلانية أخرى تنتج النمط نفسه. فالمواصلةُ لأن المشروع أوشك على الإتمام قد تكون صوابًا، إذ قد تكون الكلفةُ المتبقّية للإنجاز صغيرةً قياسًا بالمنفعة المتبقّية. والمواصلةُ لحفظ خيار، أو لصون سمعةٍ لدى مقدّمي رأس المال، أو لتجنّب غرامةٍ تعاقدية، أو لتعلّم شيءٍ لا تكشفه إلا المواصلة، كلُّها أسبابٌ ناظرة إلى الأمام تولّد السلوك الملحوظ. والدراسةُ التي لا تسعّرها تنسب إلى الانحياز ما قد يكون تعظيمًا عاديًّا تحت قيودٍ لا يراها الباحث.

والتفسيران الرئيسان يصعب فصلهما خارج المختبر. فالالتزامُ العلني وتأطيرُ الخسارة يقترنان في كل حالةٍ واقعية تقريبًا. وتصميمُ الخلَف يعين، لكنّ الخلفاء يرثون كذلك ميزانياتٍ وكلفًا غارقةً وجماهير، فحتى هناك لا تنفكّ الآليتان إلا جزئيًّا. والأوراقُ التي تعلن آليةً غالبةً على بياناتٍ ميدانية مبالِغةٌ في دعواها عادة.

والبِناء معرَّفٌ بالنسبة إلى مرجعٍ معياري هو نفسه مقدَّر. فمن يبني النقيض الافتراضي يفترض افتراضاتٍ في معدّلات الخصم واحتمالاتِ الإنجاز والقيمةِ المتبقّية، والتصعيدُ المقدَّر حسّاسٌ لتلك الافتراضات. وتحليلُ الحساسية على المرجع ليس اختياريًّا؛ بل هو فحصُ المتانة الرئيس الذي يقتضيه التصميم.

عامِل التصعيد مقارنةً بقرارٍ ناظرٍ إلى الأمام أُعيد بناؤه، لا بكل زيادةٍ في التمويل بعد خبرٍ سيّئ، وابنِ تلك المقارنة من وثائقَ كُتبت قبل أن تُعرَف النتيجة. واستعمل تغيّرات المسؤولية التي وقعت لأسبابٍ لا صلة لها بالمشروع نظيرًا ميدانيًّا للتلاعب الأصلي. وأبلغ التفسيرات العقلانية، من قرب الإتمام وقيمةِ الخيار والغراماتِ التعاقدية، وبيّن ما يبقى بعد حسابها. والرافعةُ العملية بِنيوية لا نفسية: معاييرُ توقّفٍ مكتوبة في وثيقة الإذن، وتمويلٌ مرحليٌّ يقتضي نعمًا جديدة، ومراجعةٌ ممّن لم يقطع الالتزام الأصلي.
  • Staw, Knee-Deep in the Big Muddy: A Study of Escalating Commitment to a Chosen Course of Action, Organizational Behavior and Human Performance, 1976.
  • Arkes and Blumer, The Psychology of Sunk Cost, Organizational Behavior and Human Decision Processes, 1985.
  • Whyte, Escalating Commitment to a Course of Action: A Reinterpretation, Academy of Management Review, 1986.
  • Brockner, The Escalation of Commitment to a Failing Course of Action: Toward Theoretical Progress, Academy of Management Review, 1992.
  • Sleesman, Conlon, McNamara and Miles, Cleaning Up the Big Muddy: A Meta-Analytic Review of the Determinants of Escalation of Commitment, Academy of Management Journal, 2012.